|
|
 |
|
|
| |
| Fittings ISO 9001:2000 |
|
Valves & Manifolds ISO 9001:2000 |
|
Fittings PED Certificate |
|
Valves PED Certificate |
| |
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
| Our uncompromising attitude to quality, and our quest for excellence, has ensured that we have grown from modest beginnings into a sizeable operation. Accredited with ISO 9001:2000 and PED certification, we offer complete component traceability All material is regularly checked and thoroughly approved either in house or by authorised laboratories. And, test results and other documentation are maintained to produce a case history for future reference. |
|
|
|
| The team at Fluid Controls Pvt. Ltd. is a diverse family of engineers, technical experts, and technicians, each
with a wealth of experience. Despite the
difference in backgrounds and experience,
the team has one thing in common : |
|
|
|
| TOTAL COMMITMENT TO
CLIENT SATISFACTION |
|
|
|
| This commitment ensures that we : |
|
|
|
| • |
build long-term partnerships with clients |
|
|
| • |
provide quality service to our lcients |
|
|
| • |
deliver products of superior quality |
|
|
| • |
focus on detecting risks and weaknesses |
|
|
| • |
focus on detecting potential for process
optimisation for our clients |
|
|
| We have many product approvals under 3rd party inspection, some of which are by : |
|
|
|
|
|
| • |
Det Norske Veritas |
|
|
| • |
Bureau Veritas |
|
|
| • |
Engineers India Ltd |
|
|
| • |
Lloyds |
|
|
| • |
ABS |
|
|
| • |
PDIL |
|
|
| • |
RITES |
|
|
|
|
| Go to top |
|
 |
|
|
|
|
|
|
| • |
Complete in-house testing facilities available for all the products manufactured by us |
|
|
| • |
All tests are carried out in strict conformity to ASME 1387: 2002, and records are maintained as per ISO 9001: 2000 |
|
|
| • |
Our test laboratory, which is independent of production, is completely equipped for dimensional inspection of the various components |
|
|
| • |
A complete set of gauges for all dimensions, threads, tapers, finish, coating thickness of plating, and other dimensions / features of our fittings are available on site |
|
|
| • |
A complete system of logging is maintained for calibration certification for all equipment, gauges, measuring instruments etc. to ensure that their calibration remains valid at all times. |
|
|
|
|
|
|
| Details of In-House Testing Available |
|
|
|
| • |
Hydrostatic test with water as the testing medium up to 1400 Kg/Cm2 (20,000 psi). By end April, 2007, this testing facility will be augmented to test products up to 30,000 psi |
|
|
| • |
Pneumatic testing facility using dry air and/or nitrogen for pressures up to 210 Kg/Cm2 (3,000 psi). By end April, 2007, this facility is being augmented to 450 Kg/Cm2 (6,500 psi). |
|
|
| • |
Vacuum Test for vacuum up to 850mbar |
|
|
| • |
Hydraulic Impulse and Vibration test which may be carried out simultaneously or individually as follows: |
|
|
|
|
| |
| • |
Hydraulic impulses at the rate of 15 to 35 cycles per minute and impulses up to 300 Kg/cm2 (4400 psi) |
|
|
| • |
Vibration in two mutual perpendicular planes stressing the material of the tubes to 80% of the yield strength at the rate of 1440 cycles per minute |
|
|
| • |
Temperature cycling for temperatures from room to 350 deg C with various rise, soak and cooling time |
|
|
| • |
Helium Leak test facility for checking leakages of helium up to 1 x 10-6 Standard CC per sec |
|
|
| • |
Make and re-make test for repeatability of assemblies over 25 up to a maximum of 65 cycles |
|
|
| • |
Burst Pressure test for testing up to 4 times the working pressure of tubes for tube sizes up to 1" OD |
|
|
| • |
Corrosion Resistance of plating as per ASTM B840 : 2002 by salt spray method |
|
|
| • |
Optical Comparitor for testing of profiles of threads and other tapers in conformity with the requirements of the various products manufactured by us |
|
|
|
|
|
|
|
| Go to top |
|
|
|
|
|
|
|
| • |
Bharat Dynamics Limited |
|
• |
ABS |
| |
|
|
|
|
| • |
Bharat Heavy Electricals Ltd. |
|
• |
BCD Consultants |
| |
|
|
|
|
| • |
Chittaranjan Locomotive Works |
|
• |
Bharat Pumps & Compressors Ltd |
| |
|
|
|
|
| • |
Diesel Locomotive Works |
|
• |
CEIL |
| |
|
|
|
|
| • |
Dun & Bradstreet Information Services (I) Pvt. Ltd |
|
• |
Chittaranjan Locomotive Works |
| |
|
|
|
|
| • |
Engineers India Limited |
|
• |
Det Norske Veritas |
| |
|
|
|
|
| • |
Fact Engg & Design Org (FEDO) |
|
• |
Deutsche Babcock |
| |
|
|
|
|
| • |
Gas Turbine Research Establishment |
|
• |
Engineers India Limited |
| |
|
|
|
|
| • |
Govt. of India (Dept. of Quality Assurance) - DGQA |
|
• |
IGCAR (Dept. of Atomic Energy) |
| |
|
|
|
|
| • |
Hindustan Petroleum Corporation Ltd. |
|
• |
Instrumentation Ltd |
| |
|
|
|
|
| • |
Indian Farmers Fertilisers Cooperative Ltd. |
|
• |
IRS |
| |
|
|
|
|
| • |
Integral Coach Factory |
|
• |
Krishak Bharati Co-operative Ltd. |
| |
|
|
|
|
| • |
Larsen & Toubro Ltd. |
|
• |
Lloyds Register |
| |
|
|
|
|
| • |
National Thermal Power Corporation |
|
• |
Nuclear Power Corporation of India Limited |
| |
|
|
|
|
| • |
Naval Science & Technological Laboratory |
|
• |
Oil & Natural Gas Corpn. Limited |
| |
|
|
|
|
| • |
Nuclear Power Corporation of India Limited |
|
• |
PDIL |
| |
|
|
|
|
| • |
Oil & Natural Gas Corpn. Ltd. |
|
• |
RITES |
| |
|
|
|
|
| • |
Reliance Industries Limited |
|
• |
SGS |
| |
|
|
|
|
| • |
Research & Development Establishment (Engg.) |
|
• |
Tata Projects |
| |
|
|
|
|
| • |
Research Centre Imarat |
|
• |
TUV |
| |
|
|
|
|
| • |
Steel Authority of India Ltd., Bhilai & Bokaro |
|
• |
WE for DMDE Establishment |
| |
|
|
|
|
| • |
Tata Honeywell Limited |
|
|
|
| |
|
|
|
|
| • |
Toyo Engineering India Limited |
|
|
|
| |
|
|
|
|
| • |
UHDE India Ltd. |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|